8:30 – Registration
9:00 – Presentations
12:00 – Catered lunch
1:00 – Workshop and panel discussion
3:00 – Social function (Steamworks Pub)
Presentations:
Rehabilitation of a Converged Drawpoint at the New Afton Mine
Corey Kamp, New Afton
Part 1: An Innovative Transition to Mass Mining
Steve Olson, North American Palladium
Part 2: Integrated Particle Flow Modeling: From Concept to Operations
Steve Olson, North American Palladium & Scott O’Connor, Deswik Mining Consultants
Effective Cave Draw Strategies to Manage Point Loading/Crushing of the Extraction Level
Andre Van As, Van As Consulting
Effective Ground Support Strategies for Rehabilitating the Extraction Level
Sami Talu, Rio Tinto
Rehabilitation in Weak Ground – Cassiar and Other Case Studies
Jarek Jakubec, SRK Consulting
Cave Recovery After Major Failures
Alan Guest, Alan Guest Technical Consulting
Click here to register.
Back to Workshop IV
The post Preliminary Schedule appeared first on Cave Mining Forum.